This is our welcome page
Containerized Plant Installation at Island Resort
Click on images for enlarged views
The Playa Rocca Resort, Lanzarote,  
Canary Islands, where the installation
took place.
The 300 m³/day plant fully assembled
in 20-foot container arrives at Resort
A local crane contractor is hired to move
the container plant from the truck to it's
permanent location.
Installation site prepared by contractor
with electricity and connections for feed
water well, permeate reservoir and brine
disposal well.  
Interior view of container plant with a
capacity of 300m³/day (75,000 GPD)
producing high quality potable water
at $0.70/m³ or $2.65/k-gallons.